Montage 2.0

It’s all about Cryogenius.

demaco

Montage 2.0

Due to the worldwide outbreak of the coronavirus, a large number of installations have been put on hold. Slowly but surely these and of course new projects can be scheduled again. This means overloaded installation planning. Demaco is in possession of four fully equipped installation vans. However, this does not seem to be enough for the coming period!

Yet: at Demaco, we think in terms of solutions. In order to be able to serve our customers effectively and as quickly as possible, we have transformed a container into a fully equipped workstation and have equipped five large toolboxes with all the tools needed to carry out an on-site assembly of cryogenic infrastructure. By sending the container or toolbox to the desired location, we can drive a rental car at the back of it to quickly provide the customers with their cryogenic infrastructure. Governing is looking ahead. It’s all about Cryogenius.

Verwandte Beiträge

Demaco besucht ESS

Demaco besucht ESS

Bei Demaco sehen wir unsere Systeme gerne im Betrieb. Auch nach der Produktion und Installation halten wir guten

Bitte kontaktieren Sie uns für weitere Informationen

Subscribe to Demaco