Demaco is involved in one of the biggest scientific projects in Europe these days: FAIR at GSI in Darmstadt (D). In December 2019, we signed the contract, where Demaco has been commissioned to design, produce, supply and install the cryogenic distribution system for SIS 100. The design phase of the multiple transfer lines is completed and this week the production has started. We’re thrilled to see the vacuum-insulated transfer lines growing in our workshop! Here you see for example the vacuum barrier in a straight section Area one (our section 14). It’s all about Cryogenius.